Hi community, Following the review feedback, I opened a follow-up PR: https://github.com/apache/seatunnel/pull/11970
It: 1. Remove the retry wrapper from the two Maven compilation steps. A retry cannot reliably distinguish a temporary dependency-download failure from a deterministic compilation failure introduced by the queued change, so the original failure should be reported directly. 2. Configure the ASF Infra apache/root team as the emergency fallback for the Merge Queue ruleset. This uses the same team ID as existing ASF configurations and is intended only as a last-resort recovery path when the queue remains unavailable after normal troubleshooting. 3. Adds English and Chinese guides for queue usage, troubleshooting, and recovery. Feedback is welcome. Best regards, Zhiwei Niu David Zollo <[email protected]> 于2026年8月26日周三 11:54写道: > Good job. I've merged this PR just now and I look forward to seeing the > latest effect. > > > > Best Regards, > David > Linkedin: https://www.linkedin.com/in/davidzollo > > > > On Tue, Aug 25, 2026 at 12:44 PM zhiwei niu <[email protected]> wrote: > > > Hi community, > > > > Thanks for the feedback. I have opened the implementation PR: > > > > https://github.com/apache/seatunnel/pull/11963 > > > > Looking forward to the review and suggestions in PR > > > > > > Best regards, > > Zhiwei Niu > > > > > > David Zollo <[email protected]> 于2026年8月25日周二 23:15写道: > > > > > Good direction. Looking forward to your PR. > > > > > > > > > > > > Best Regards, > > > David > > > Linkedin: https://www.linkedin.com/in/davidzollo > > > > > > > > > > > > On Tue, Aug 25, 2026 at 3:20 AM zhiwei niu <[email protected]> > wrote: > > > > > > > Hi guys, > > > > > > > > I found some related discussions from ASF and Apache Kafka. > > > > > > > > ASF discussed the temporary branches created by GitHub Merge Queue in > > > > LEGAL-599, which has now been resolved: > > > > > > > > https://issues.apache.org/jira/browse/LEGAL-599 > > > > > > > > Kafka has accepted KIP-1126 to introduce GitHub Merge Queue: > > > > > > > > > > > > > > > > > > https://cwiki.apache.org/confluence/spaces/KAFKA/pages/340036064/KIP-1126+Serialize+changes+to+Kafka+with+a+build+queue > > > > > > > > Kafka also created an ASF-hosted sandbox for evaluation: > > > > > > > > https://github.com/apache/kafka-merge-queue-sandbox > > > > > > > > The implementation is still being tracked here: > > > > > > > > https://issues.apache.org/jira/browse/KAFKA-18789 > > > > > > > > This shows that there is already precedent for Apache projects to > > explore > > > > and adopt Merge Queue. > > > > > > > > > > > > Best regards, > > > > Zhiwei Niu > > > > > > > > > > > > Doyeon Kim <[email protected]> 于2026年8月25日周二 14:01写道: > > > > > > > > > +1 > > > > > > > > > > On Tue, Aug 25, 2026 at 2:05 PM zhiwei niu <[email protected]> > > > wrote: > > > > > > > > > > > Hi community, > > > > > > > > > > > > A. Background: > > > > > > > > > > > > Recently, two deterministic compilation failures were > reproducible > > on > > > > the > > > > > > `dev` branch after changes had been merged: > > > > > > > > > > > > 1. [PR #11954: Fix the missing test constant reference]( > > > > > > https://github.com/apache/seatunnel/pull/11954) > > > > > > A previous change removed a constant but missed one remaining > > > > > reference, > > > > > > causing the test sources in `seatunnel-engine-server` to fail > > > > > > compilation. > > > > > > 2. [PR #10998: Adapt to a method signature change]( > > > > > > https://github.com/apache/seatunnel/pull/10998) > > > > > > A parameter was added to a method signature, but one call site > > was > > > > not > > > > > > updated, causing `JdbcHiveIT` to fail compilation. > > > > > > > > > > > > These were deterministic compilation errors rather than flaky > > > failures. > > > > > CI > > > > > > for > > > > > > an individual PR validates the PR at that point in time, but it > > > cannot > > > > > > fully > > > > > > guarantee that the PR will still build successfully when combined > > > with > > > > > the > > > > > > latest `dev` branch and other PRs merged shortly before it. > > > > > > > > > > > > > > > > > > B. Merge Queue introduction: > > > > > > > > > > > > Merge Queue adds a final integration gate before a PR enters > `dev`. > > > > After > > > > > > `Merge when ready` is clicked, the PR is not merged immediately. > > > GitHub > > > > > > creates > > > > > > a temporary `merge_group` containing the latest `dev`, the > current > > > PR, > > > > > and > > > > > > the > > > > > > PRs ahead of it in the queue, and then triggers the configured CI > > > > checks. > > > > > > > > > > > > The PR is merged in order only after all required checks pass. > If a > > > > check > > > > > > fails, > > > > > > times out, or a conflict occurs, the corresponding PR is removed > > from > > > > the > > > > > > queue > > > > > > and the `dev` branch remains unchanged. This validates the final > > > > > > combination of > > > > > > changes immediately before merging and prevents independently > > > > successful > > > > > > PRs > > > > > > from breaking `dev` when merged consecutively. > > > > > > > > > > > > Official documentation: [GitHub Merge Queue] > > > > > > < > > > > > > > > > > > > > > > > > > > > > https://docs.github.com/en/repositories/configuring-branches-and-merges-in-your-repository/configuring-pull-request-merges/managing-a-merge-queue > > > > > > > > > > > > > > > > > > > > > > > > > C. Questions and answers: > > > > > > > > > > > > [1] What test scope will the merge queue execute? > > > > > > It will run: ./mvnw -B -T 1C clean install -DskipTests > > > > > > This command skips test execution but still compiles both main > and > > > test > > > > > > sources, > > > > > > allowing deterministic errors such as missing constants and > > > > incompatible > > > > > > method > > > > > > signatures to be detected. > > > > > > > > > > > > > > > > > > [2] What state will a PR be in if the build fails? > > > > > > The PR will be removed from the queue and remain open. The PR > > > page > > > > > will > > > > > > show the > > > > > > Merge Queue failure reason and build logs. After the problem is > > fixed > > > > or > > > > > > the > > > > > > branch is rebased, someone with Write permission must click > `Merge > > > when > > > > > > ready` > > > > > > again to re-enter the queue. > > > > > > > > > > > > [3] How long will a merge queue build take? > > > > > > Recent comparable single-threaded full `install` CI jobs > > averaged > > > > > about > > > > > > 20 minutes. With a four-core runner and `-T 1C`, one PR is > expected > > > to > > > > > take > > > > > > approximately 10–20 minutes. A 30-minute timeout is recommended. > > > > > > > > > > > > [4] If the merge queue build fails, has the PR already been > merged? > > > > > > No. A PR is merged only after the Merge Queue build succeeds. > If > > > the > > > > > > build > > > > > > fails, the PR remains open and `dev` is unchanged. > > > > > > > > > > > > [5] After the Merge Queue is introduced, can I choose to merge > > > directly > > > > > > without > > > > > > entering the queue? > > > > > > A direct-merge option can be retained, but only for > > administrators > > > > or > > > > > > users with > > > > > > Branch Protection Bypass permission when the branch protection > rule > > > > > allows > > > > > > bypassing. Regular users with Write permission must still use > Merge > > > > > Queue. > > > > > > > > > > > > [6] If one of several queued PRs fails, will the entire queue > fail, > > > and > > > > > how > > > > > > will it be handled? > > > > > > No. The failed PR is removed from the queue. Any later > temporary > > > > > > branches > > > > > > containing that PR become invalid, so GitHub recreates them from > > the > > > > > > updated > > > > > > queue and runs their checks again. > > > > > > > > > > > > [7] Can merge queue builds run in parallel? > > > > > > Yes. `Build concurrency` can be configured from 1 to 100. An > > > > initial > > > > > > value of 5 > > > > > > is recommended, allowing up to five queued PRs to be validated > > > > > concurrently > > > > > > while additional PRs wait. > > > > > > > > > > > > [8] How many PRs can be added to the queue at one time, and what > > > > happens > > > > > > after > > > > > > that number is exceeded? > > > > > > Each operation adds the current PR, while the queue can > continue > > > > > > accepting > > > > > > additional PRs. GitHub does not publish a total queue-length > limit. > > > PRs > > > > > > exceeding > > > > > > the configured build concurrency wait in FIFO order; they are not > > > fail > > > > > > > > > > > > Feedback and suggestions are welcome. > > > > > > > > > > > > Best regards, > > > > > > Zhiwei Niu > > > > > > > > > > > > > > > > > > > > >
