[ 
https://issues.apache.org/jira/browse/SLIDER-621?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Steve Loughran updated SLIDER-621:
----------------------------------
    Summary: increase timeouts of integration tests to 30m  (was: increase 
timeouts of integration tests)

> increase timeouts of integration tests to 30m
> ---------------------------------------------
>
>                 Key: SLIDER-621
>                 URL: https://issues.apache.org/jira/browse/SLIDER-621
>             Project: Slider
>          Issue Type: Sub-task
>          Components: test
>            Reporter: Steve Loughran
>            Assignee: Steve Loughran
>             Fix For: Slider 0.60
>
>
> Integration tests are failing on some runs, especially 
> {{AgentClusterLifecycleIT}}, which is doing a lot of create/freeze/thaw/kill 
> on an application. After 10 minutes, the test is killed.
> increase the default so you don't need to explicitly set the config for 
> reliable test runs.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to