[ 
https://issues.apache.org/jira/browse/SLING-837?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Carsten Ziegeler closed SLING-837.
----------------------------------


> Integrate JCRInstall integration tests with the main integration tests
> ----------------------------------------------------------------------
>
>                 Key: SLING-837
>                 URL: https://issues.apache.org/jira/browse/SLING-837
>             Project: Sling
>          Issue Type: Improvement
>          Components: Installer
>    Affects Versions: JCR Installer 3.0.0
>            Reporter: Felix Meschberger
>            Assignee: Felix Meschberger
>             Fix For: JCR Installer 3.0.0
>
>
> JCRInstall integration tests currently fail since the test setup has not been 
> adapted to the new launchpad yet. In addition, these tests may cause the 
> build to breack due to PermGen space problems (at least on my box). Finally 
> all integration tests should probably run together.
> So we should do this:
>   * in the short-term I switch off the JCRInstall integration tests
>   * Migrate the JCR Integration tests to the main integration tests 
> (launchpad/testing)
>   * Configure the JCR Integration tests in a build profile, which is not 
> active by default

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

Reply via email to