[
https://issues.apache.org/jira/browse/SLING-2189?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Carsten Ziegeler resolved SLING-2189.
-------------------------------------
Resolution: Fixed
Set priority to 50 in revision 1159553
> Resources installed by launchpad should not have default priority
> -----------------------------------------------------------------
>
> Key: SLING-2189
> URL: https://issues.apache.org/jira/browse/SLING-2189
> Project: Sling
> Issue Type: Bug
> Components: Launchpad
> Affects Versions: Launchpad Installer 1.0.4
> Reporter: Carsten Ziegeler
> Assignee: Carsten Ziegeler
> Fix For: Launchpad Installer 1.0.6
>
>
> Resources from the launchpad installer use the default priority which is 100
> - this is the same priority as resources from the repository (jcr installer,
> libs dir)
> The priority of the launchpad resources should be lower.
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira