[ 
https://issues.apache.org/jira/browse/SLING-2368?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Bertrand Delacretaz reassigned SLING-2368:
------------------------------------------

    Assignee: Bertrand Delacretaz

> ServerSetup utility - more flexible way of setting up the server-side of 
> integration tests
> ------------------------------------------------------------------------------------------
>
>                 Key: SLING-2368
>                 URL: https://issues.apache.org/jira/browse/SLING-2368
>             Project: Sling
>          Issue Type: Improvement
>          Components: Testing
>            Reporter: Bertrand Delacretaz
>            Assignee: Bertrand Delacretaz
>            Priority: Minor
>
> I need a more flexible way of setting up Sling-based servers for integration 
> testing, that allows the various phases of the server setup (start runnable 
> jar, wait for it to be ready, install additional bundles, create test content 
> etc) to be selectively run or ignored.
> This is useful when such server setups are slow, for example when testing 
> upgrades from one Sling-based system to another, which means starting an old 
> version, setting up some content on it, stopping it, starting the new 
> version, running tests on it to check that the test content was preserved or 
> suitably adapted, etc.
> Being able to selectively disable setup tasks allows for restarting tests 
> from saved states, which is often much faster than redoing the whole setup 
> when debugging the resulting system or its tests.
> I'll create the corresponding utilities under testing/tools and use them in 
> testing/samples as an example.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to