[
https://issues.apache.org/jira/browse/SLING-8627?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
angela updated SLING-8627:
--------------------------
Attachment: SLING-8627.patch
> Update sling-jcr-repoinit to Oak 1.16.0 and Jackrabbit 2.18.2
> -------------------------------------------------------------
>
> Key: SLING-8627
> URL: https://issues.apache.org/jira/browse/SLING-8627
> Project: Sling
> Issue Type: Task
> Components: Repoinit
> Reporter: angela
> Priority: Major
> Attachments: SLING-8627.patch
>
>
> while working on the patch for SLING-8602 i noticed that the ITs are failing
> as soon as i update oak and jackrabbit version in _sling-jcr-repoinit_. i
> verified that by taking an unmodified checkout and just adjusting the the
> _oak.version_ and _jackrabbit.version_ properties.
> the issue is (up to now) two fold:
> # the embedded org.apache.jackrabbit bundles in
> _org.apache.sling.testing.sling-mock-oak_ (see SLING-8625) prevent the
> configured oak/jackrabbit versions to take effect
> # once that is fix, the ITs (setup configuration with launchpad 9) will fail
> the latter most likely require multiple changes
> - updating the _it-model.txt_ to list oak bundles in order to avoid
> unresolved oak dependencies
> - once that is solved the ITs fail with missing SlingRepository service and
> [~radu.cotescu] suspected that it might be required to additionally update
> _org.apache.sling.jcr.oak.server_ to oak 1.16.0. if that turns out to be
> needed i would cover it with another task.
--
This message was sent by Atlassian JIRA
(v7.6.14#76016)