On Sun, May 13, 2018 at 9:43 PM Hyukjin Kwon <gurwls...@gmail.com> wrote:
> From a very quick look, I believe that's just occasional network issue in > AppVeyor. For example, in this case: > Downloading: > https://repo.maven.apache.org/maven2/org/scala-lang/scala-compiler/2.11.8/scala-compiler-2.11.8.jar > This took 26ish mins and seems further downloading jars look mins much > more than usual. > > FYI, It usually takes built 35 ~ 40 mins and R tests 25 ~ 30 mins where > usually ends up 1 hour 5 min. > Will take another look to reduce the time if the usual time reaches 1 hour > and 30 mins (which is the current AppVeyor limit). > I did this few times before - https://github.com/apache/spark/pull/19722 > and https://github.com/apache/spark/pull/19816. > > The timeout is already increased from 1 hour to 1 hour and 30 mins. They > still look disallowing to increase timeout anymore. > I contacted with them few times and manually requested this. > > For the best, I believe we usually just rebase rather than merging the > commits in any case as mentioned in the contribution guide. > I don’t recal this being a thing that we actually go that far in encouraging. The guide says rebases are one of the ways folks can keep their PRs up to date, but no actually preference is stated. I tend to see PRs from different folks doing either rebases or merges since we do squash commits anyways. I know for some developers keeping their branch up to date merge commits tend to be less effort, and provided the diff is still clear and the resulting merge is also clean I don’t see an issue. > The test failure in the PR should be ignorable if that's not directly > related with SparkR. > > > Thanks. > > > > 2018-05-14 8:45 GMT+08:00 Ilan Filonenko <i...@cornell.edu>: > >> Hi dev, >> >> I recently updated an on-going PR [ >> https://github.com/apache/spark/pull/21092] that was updated with a >> merge that included a lot of commits from master and I got the following >> error: >> >> *continuous-integration/appveyor/pr *— AppVeyor build failed >> >> due to: >> >> *Build execution time has reached the maximum allowed time for your plan >> (90 minutes).* >> >> seen here: >> https://ci.appveyor.com/project/ApacheSoftwareFoundation/spark/build/2300-master >> >> As this is the first time I am seeing this, I am wondering if this is in >> relation to a large merge and if it is, I am wondering if the timeout can >> be increased. >> >> Thanks! >> >> Best, >> Ilan Filonenko >> > > -- Twitter: https://twitter.com/holdenkarau