Robert Joseph Evans created STORM-898:
-----------------------------------------
Summary: Add priorities and per user resource guarantees to
Resource Aware Scheduler
Key: STORM-898
URL: https://issues.apache.org/jira/browse/STORM-898
Project: Apache Storm
Issue Type: New Feature
Reporter: Robert Joseph Evans
In a multi-tenant environment we would like to be able to give individual users
a guarantee of how much CPU/Memory/Network they will be able to use in a
cluster. We would also like to know which topologies a user feels are the most
important to keep running if there are not enough resources to run all of their
topologies.
Each user should be able to specify if their topology is production, staging,
or development. Within each of those categories a user should be able to give a
topology a priority, 0 to 10 with 10 being the highest priority (or something
like this).
If there are not enough resources on a cluster to run a topology assume this
topology is running using resources and find the user that is most over their
guaranteed resources. Shoot the lowest priority topology for that user, and
repeat until, this topology is able to run, or this topology would be the one
shot. Ideally we don't actually shoot anything until we know that we would
have made enough room.
If the cluster is over-subscribed and everyone is under their guarantee, and
this topology would not put the user over their guarantee. Shoot the lowest
priority topology in this workers resource pool until there is enough room to
run the topology or this topology is the one that would be shot. We might also
want to think about what to do if we are going to shoot a production topology
in an oversubscribed case, and perhaps we can shoot a non-production topology
instead even if the other user is not over their guarantee.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)