[ 
https://issues.apache.org/jira/browse/STORM-898?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15045215#comment-15045215
 ] 

ASF GitHub Bot commented on STORM-898:
--------------------------------------

Github user jerrypeng commented on the pull request:

    https://github.com/apache/storm/pull/921#issuecomment-162585896
  
    @hustfxj thanks for your comment.  Topology priorities are relative to the 
user.  The main metric to compare uses is how much of their resource guarantee 
is satisfied.  Given the example your provide, the only reason why a topology 
from user A is going to be killed due to User B submitted a topology is because 
user A is above his or her resource guarantee given user B is below his or her 
resource guarantee. To prevent this happening, User A must have a higher 
resource guarantee or at least higher than user C if you want topologies from 
user C to be killed.  However, in my implementation the eviction strategy to 
use is a pluggable interface so you can easily add addition logic or create a 
whole entire eviction strategy to fit your needs


> Add priorities and per user resource guarantees to Resource Aware Scheduler
> ---------------------------------------------------------------------------
>
>                 Key: STORM-898
>                 URL: https://issues.apache.org/jira/browse/STORM-898
>             Project: Apache Storm
>          Issue Type: New Feature
>          Components: storm-core
>            Reporter: Robert Joseph Evans
>            Assignee: Boyang Jerry Peng
>         Attachments: Resource Aware Scheduler for Storm.pdf
>
>
> In a multi-tenant environment we would like to be able to give individual 
> users a guarantee of how much CPU/Memory/Network they will be able to use in 
> a cluster.  We would also like to know which topologies a user feels are the 
> most important to keep running if there are not enough resources to run all 
> of their topologies.
> Each user should be able to specify if their topology is production, staging, 
> or development. Within each of those categories a user should be able to give 
> a topology a priority, 0 to 10 with 10 being the highest priority (or 
> something like this).
> If there are not enough resources on a cluster to run a topology assume this 
> topology is running using resources and find the user that is most over their 
> guaranteed resources.  Shoot the lowest priority topology for that user, and 
> repeat until, this topology is able to run, or this topology would be the one 
> shot.   Ideally we don't actually shoot anything until we know that we would 
> have made enough room.
> If the cluster is over-subscribed and everyone is under their guarantee, and 
> this topology would not put the user over their guarantee.  Shoot the lowest 
> priority topology in this workers resource pool until there is enough room to 
> run the topology or this topology is the one that would be shot.  We might 
> also want to think about what to do if we are going to shoot a production 
> topology in an oversubscribed case, and perhaps we can shoot a non-production 
> topology instead even if the other user is not over their guarantee.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to