On 3/31/06, Ted Husted <[EMAIL PROTECTED]> wrote:
> If Hubert did have time to drop the plug-in now, that would be a
> reasonable first step. Then, we can integrate into a 1.4 DTD, if
> that's what we want to do. We did the same sort of thing with opt-in
> Cancel Handling. We "patched" 1.2 and then made the DTD change in 1.3.

I just thought that having one change in DTD is better than having two
consecutive changes. It was pointed out in another thread that
stability (both code and API) is Struts' key to success. If a change
requires DTD to be updated, I'd rather have it combined with other DTD
updates in one bigger chunk. But this is just me.

I don't want to rush Hubert ;)

Michael.

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to