Thanks for the responses. I'll take a look at what is required for TEZ-2815
and TEZ-2798. Hitesh, do you have specific jiras in mind for the flakey
tests. There's a couple more jiras which I'd like to get in - will send out
a list with a 0.8.2 target soon.

On Fri, Dec 4, 2015 at 12:00 PM, Bikas Saha <[email protected]> wrote:

> https://issues.apache.org/jira/browse/TEZ-2798 and
> https://issues.apache.org/jira/browse/TEZ-2815 should be blockers for
> this.
> Even though the APIs may be marked unstable, having them throw exceptions
> in
> their signature is essential. Also, without these there is currently a
> constant stream of NPE's in all tests that use the MockDAGAppMaster.
>
> Bikas
>
> -----Original Message-----
> From: Hitesh Shah [mailto:[email protected]]
> Sent: Friday, December 4, 2015 11:04 AM
> To: [email protected]
> Subject: Re: [DISCUSS] Next release from the 0.8 line - 0.8.2
>
> +1 to the 0.8.2 release with a couple of caveats:
>
> 1) Unit tests have been very flaky recently on Jenkins and we should aim to
> get them stable before releasing
> 2) Clearly calling out the pluggable service APIs as unstable/likely to
> change within the 0.8.x line as part of the release notes.
>
> - Hitesh
>
>
>
> On Dec 3, 2015, at 1:24 PM, Siddharth Seth <[email protected]> wrote:
>
> > More than 50 jiras have been added since the last release from the 0.8
> > line (0.8.1-alpha). More importantly, this branch has gotten quite a
> > bit of testing, especially while running against Hive 2.0 and LLAP.
> > At this point, I think we can drop the alpha monicker from the release
> > - and mark it for public consumption. The APIs for pluggable services
> > can be called out as unstable in the release notes.
> >
> > Thanks
> > - Sid
>
>
>

Reply via email to