Jaume M created TEZ-3987:
----------------------------
Summary: Schedule giving priorities based on topological order
Key: TEZ-3987
URL: https://issues.apache.org/jira/browse/TEZ-3987
Project: Apache Tez
Issue Type: New Feature
Reporter: Jaume M
It'd be an improvement for some DAGs to be scheduled in a topological order as
opposed to the scheduling based on distance from the root from {{DAGScheduler}}
and {{DAGSchedulerControlled}}.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
