https://issues.apache.org/jira/browse/TINKERPOP3-820?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
stephen mallette updated TINKERPOP3-820:
----------------------------------------
Affects Version/s: (was: 3.1.0-incubating)
3.0.0-incubating
> Change steps after the strategy phase.
> --------------------------------------
>
> Key: TINKERPOP3-820
> URL: https://issues.apache.org/jira/browse/TINKERPOP3-820
> Project: TinkerPop 3
> Issue Type: Improvement
> Components: process
> Affects Versions: 3.0.0-incubating
> Reporter: pieter martin
> Assignee: Marko A. Rodriguez
>
> Hi,
> I am working on optimizing the order() step for sqlg (generating the order by
> clause in the sql).
> So far I have been collapsing steps in the strategy phase. However to
> optimize the order() clause I need to pre-parse the (so-far) collapsed step
> to know whether a OrderGlobalStep step can be optimized or not.
> For a traversal starting from a GraphStep this is ok as the traversal starts
> from a label which is available and thus the pre-parser has all the
> information it needs available to it at the strategy phase.
> For a traversal that starts from a VertexStep the start vertex is only known
> runtime (after iterating) so the pre-parser can only execute at runtime to
> gather the information needed to optimize the OrderGlobalStep. This means in
> order to optimize a the traversal I need to change the steps after starting
> the iteration.
> Unfortunately the traversal is locked and I am unable to optimize steps
> whilst iterating.
> I removed the lock code and my optimizations are working fine. All tests pass
> except for the lock specific test
> {{CoreTraversalTest.shouldNotAlterTraversalAfterTraversalBecomesLocked}}.
> Is removing or disabling the lock something that will be considered.
> Bit like a JIT compiler, we can change the execution strategy/step/path after
> having started the iteration.
> Thanks
> Pieter
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)