[
https://issues.apache.org/jira/browse/TUBEMQ-311?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Guocheng Zhang reassigned TUBEMQ-311:
-------------------------------------
Assignee: Guocheng Zhang
> Feedback more production information
> ------------------------------------
>
> Key: TUBEMQ-311
> URL: https://issues.apache.org/jira/browse/TUBEMQ-311
> Project: Apache TubeMQ
> Issue Type: Improvement
> Components: Client, Server
> Reporter: Guocheng Zhang
> Assignee: Guocheng Zhang
> Priority: Major
>
> After the server successfully processes the Producer's message, if it can
> provide the producer with the storage time of the message and the starting
> offset position of the message storage, the business can better understand
> the production situation, such as the delay of the message from being sent to
> being accepted, the current storage location etc.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)