[ 
https://issues.apache.org/jira/browse/TUBEMQ-311?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Guocheng Zhang reassigned TUBEMQ-311:
-------------------------------------

    Assignee: Guocheng Zhang

> Feedback more production information
> ------------------------------------
>
>                 Key: TUBEMQ-311
>                 URL: https://issues.apache.org/jira/browse/TUBEMQ-311
>             Project: Apache TubeMQ
>          Issue Type: Improvement
>          Components: Client, Server
>            Reporter: Guocheng Zhang
>            Assignee: Guocheng Zhang
>            Priority: Major
>
> After the server successfully processes the Producer's message, if it can 
> provide the producer with the storage time of the message and the starting 
> offset position of the message storage, the business can better understand 
> the production situation, such as the delay of the message from being sent to 
> being accepted, the current storage location etc.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to