Guocheng Zhang created TUBEMQ-386:
-------------------------------------
Summary: Add the operation of automatic reload configuration
Key: TUBEMQ-386
URL: https://issues.apache.org/jira/browse/TUBEMQ-386
Project: Apache TubeMQ
Issue Type: Improvement
Reporter: Guocheng Zhang
At present, the reload operation is executed serially: if there are multiple
configurations change, the effective time of the change will be relatively long
due to the serial operation of the interface; at the same time, the reload
operation requires external batch loading according to the current cluster
reload status, and these settings are aggravated considering the complexity of
interface usage. so I consider making the following adjustments:
1. The reload operation is changed to task submission mode. After receiving the
task, the Master returns a task ID to the caller; the caller queries the task
completion status through the task ID;
2. The Master controls the batches loaded and the number of each load; and
periodically records the execution results of reload in the task ID.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)