Guocheng Zhang created TUBEMQ-386:
-------------------------------------

             Summary: Add the operation of automatic reload configuration
                 Key: TUBEMQ-386
                 URL: https://issues.apache.org/jira/browse/TUBEMQ-386
             Project: Apache TubeMQ
          Issue Type: Improvement
            Reporter: Guocheng Zhang


At present, the reload operation is executed serially: if there are multiple 
configurations change, the effective time of the change will be relatively long 
due to the serial operation of the interface; at the same time, the reload 
operation requires external batch loading according to the current cluster 
reload status, and these settings are aggravated considering the complexity of 
interface usage. so I consider making the following adjustments:
1. The reload operation is changed to task submission mode. After receiving the 
task, the Master returns a task ID to the caller; the caller queries the task 
completion status through the task ID;
2. The Master controls the batches loaded and the number of each load; and 
periodically records the execution results of reload in the task ID.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to