Simon Laws wrote:
I think it's not desirable to do this because it means the travel sample
would continue to depend on a SNAPSHOT version of Tuscany even after
1.5 is released.  AIUI, the current SNAPSHOT dependency is there because
of bugs in 1.4 that prevented the travel sample from working.  Assuming
that these bugs are fixed in 1.5, the travel sample should move to a 1.5
dependency when 1.5 is released and should not depend on 1.6-SNAPSHOT.

 Simon




Right, but in next week or so while we get 1.x sorted out generally we
could rely on that and then move back to 1.5 when the branch is
re-taken.

Simon


Isn't it easier to just leave the 1.5-SNAPSHOT branch there for now
so that the travel sample can build?  When we are ready to take a
new 1.5 branch, we can replace the whole 1.5 branch with a new cut
from the 1.x branch.

  Simon


Reply via email to