Stage0 Log

Week 1:  Between the 25th of April and May 3rd 2009


Tuscany Markmail

First contact with tuscany markmail [1] and quick review of mentor’s posts
related to the projet as far as development and bugs issuing are concerned.


Alternate development environment

I used to perform developments on a dual boot with the project’s data
synchronized at both sides with a subersion repository. In case one of the
OSes messed up, i can still keep on track with coding while fixing the
issue.

Performed tasks:

   - Format the existing rusted ubuntu hardy
   - Download and install of Ubuntu Jaunty
   - Installation of needed dev tools (java, subversion, android sdk 1.5,
   eclipse ganymede + plugins (Android Developer tools, Sublipse), maven.
   - SVN checkout of the java tuscany repository
   - Maven built started but started but not terminated yet


Tuscany Android Patch

Investigation on how to get the shopping cart service consumed from android
using the atom binding after the  first provided patch
Fact: Android don’t provide yet any implementation of the Atom publishing
protocol specifiations. With Luciano, we agreed couple of weeks ago (even
before GSOC09 results to go for the Apahe Abdera project [2].

*Plan*: (*Recquire mentor’s validation*)

   - Import needed Abdera’s jars to the Android project.
   - Follow instrutions in [3] to implement the shopping cart items posting
   via the Atom publishing protocol in order to retrieve later the shopping
   cart total using JSON.Code Hosting
   Thought about projet repository creation at Google Code Hosting (*unless
   ASF provide another way doing this*)
   Projet name: tuscanystoreandroidgsoc09.
   References
   [1]: http://tuscany.markmail.org/
   [2]: http://abdera.apache.org
   [3]: http://cwiki.apache.org/ABDERA/client.html



-- 
Lookman SANNI;

Reply via email to