[
https://issues.apache.org/jira/browse/TWILL-93?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Terence Yim resolved TWILL-93.
------------------------------
Resolution: Fixed
Fix Version/s: 0.4.0-incubating
Assignee: Erick Tryzelaar
Merged and pushed to master.
> Up the zookeeper test timeouts
> ------------------------------
>
> Key: TWILL-93
> URL: https://issues.apache.org/jira/browse/TWILL-93
> Project: Apache Twill
> Issue Type: Bug
> Reporter: Erick Tryzelaar
> Assignee: Erick Tryzelaar
> Fix For: 0.4.0-incubating
>
> Attachments: 0001-Up-the-zookeeper-timeouts.patch
>
>
> Zookeeper runs a tad slow on my machine, and tests were not finishing within
> the time limits set in the unit tests. This patch ups those limits so "mvn
> test" passes.
> Patch to fix this filed here https://reviews.apache.org/r/23861/
--
This message was sent by Atlassian JIRA
(v6.2#6252)