[ 
https://issues.apache.org/jira/browse/UIMA-2591?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jerry Cwiklik updated UIMA-2591:
--------------------------------

    Fix Version/s: 1.0-Ducc

> Provide ability to cancel an individual DUCC Job Process 
> ---------------------------------------------------------
>
>                 Key: UIMA-2591
>                 URL: https://issues.apache.org/jira/browse/UIMA-2591
>             Project: UIMA
>          Issue Type: New Feature
>          Components: DUCC
>            Reporter: Lou DeGenaro
>            Assignee: Lou DeGenaro
>            Priority: Minor
>             Fix For: 1.0-Ducc
>
>
> Presently, a DUCC Job may be unable to make forward progress (including 
> termination) due to a Job Process [JP] that was dispatched to an Agent that 
> is no longer communicating.  The only way to rescue this Job (without 
> recylcing DUCC itself) is to have the Agent start reporting again, which may 
> not be feasible (for example a HW problem has caused the system to crash and 
> precludes system boot and therefore Agent from running).
> Provided here is the ability to cancel a particular JP, thus making any and 
> all incomplete Work Items previously dispatched to that JP re-deployable 
> elsewhere.
> The DUCC CLI is enhanced to provide the --dpid flag to the job cancel command.
> Note well:  if there is any possibility that the target JP is active but the 
> Agent is not, then this flag should not be used, so as to avoid the 
> possibility of the same Work Item being processed by two JPs simultaneously.



--
This message was sent by Atlassian JIRA
(v6.1.4#6159)

Reply via email to