[
https://issues.apache.org/jira/browse/UIMA-4107?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Jim Challenger closed UIMA-4107.
--------------------------------
Resolution: Fixed
> DUCC RM No longer refuse jobs for lack of resources
> ---------------------------------------------------
>
> Key: UIMA-4107
> URL: https://issues.apache.org/jira/browse/UIMA-4107
> Project: UIMA
> Issue Type: Improvement
> Components: DUCC
> Reporter: Jim Challenger
> Assignee: Jim Challenger
> Fix For: 2.0.0-Ducc
>
>
> Currently the RM rejects non-preemptable work if it cannot get all the
> resources requested for that work.
> The proposed change is to leave the unschedulable work queued against the
> possibility (probability, in most situations we have observed in practice)
> that resources will become available and the job can be scheduled.
> If the user does not want to leave the work queued it can be canceled
> manually via API, CLI, or web server.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)