[
https://issues.apache.org/jira/browse/UIMA-5462?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Lou DeGenaro resolved UIMA-5462.
--------------------------------
Resolution: Fixed
Change set delivered.
> DUCC Orchestrator (OR) should checkpoint when shutdown is requested
> -------------------------------------------------------------------
>
> Key: UIMA-5462
> URL: https://issues.apache.org/jira/browse/UIMA-5462
> Project: UIMA
> Issue Type: Bug
> Components: DUCC
> Reporter: Lou DeGenaro
> Assignee: Lou DeGenaro
> Fix For: 2.2.1-Ducc
>
>
> In order to have the closest approximation to the current state at next
> Orchestrator (OR) boot, it should do a checkpoint when a shutdown request
> arrives.
> Presently, no checkpoint is done at shutdown request time. And if a Job has
> processed 20 work items, once the OR reboots the Job will be canceled (as
> expected) but will likely show 0 work items completed on the WS Jobs page.
> But drilling down to the Job details one would discover that these 20 work
> items were indeed completed.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)