[
https://issues.apache.org/jira/browse/VCL-308?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14221398#comment-14221398
]
ASF subversion and git services commented on VCL-308:
-----------------------------------------------------
Commit 1640998 from [~fapeeler] in branch 'vcl/trunk'
[ https://svn.apache.org/r1640998 ]
VCL-758
entries for start timeout for connect timings
VCL-308
entry for image transfer
> Computer load log does not account for images that have to be transferred to
> another management node
> ----------------------------------------------------------------------------------------------------
>
> Key: VCL-308
> URL: https://issues.apache.org/jira/browse/VCL-308
> Project: VCL
> Issue Type: Bug
> Components: vcld (backend)
> Affects Versions: 2.0
> Reporter: Andy Kurth
> Fix For: 2.4
>
>
> The estimated time remaining displayed to the user does not include the time
> it takes to retrieve image files from another managment node during image
> load. If the scheduling system thinks the image is preloaded but is not and
> image retrieval is required, "Est: 1 min remaining" is displayed.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)