Just an FYI:
There are only 5 issues remaining on the list for 0.9.0, barring any
other issues that may come up.
https://issues.apache.org/jira/projects/YETUS/versions/12343819
Assuming these get committed (reviewed or via LC), I’ll be cutting a
release candidate minimally on Friday based upon the LC date. Since I’m
going to be on a plane on Sunday on my way to a vacation, I haven't thought
about when the RC would end since that won’t be enough time to vote. :(
PS: I’ve dropped some features and made a 0.10.0 release in JIRA to keep track
of them. Maybe we’ll do 0.9.1 instead or something.