Hello,
I had a look at how the job data are kept during the life cycle of a job.
The orte_job_data pointer array contains two elements:
addr[0] is filled during rte_init().
addr[1] is filled by PLM at setup time and contains the map on which
the job is spawned.
What does the first entry correspond to?
Besides, when I dump the map contained in the second element during the
execution of my application (ie, after PLM launched the job), each node
entry contains: "Daemon launched: False". Is this expected?
Thanks,
Camille