Hi everyone :-) As usually here is Trac Statistic of Milestone Om2008.10
This week's changing is totally 2 closed,2 fixed, 2 new, changed 2 tickets testing status. Please refer below the lists. *Total : 48 Closed : 10 Active : 38 * - Qtopia (18) Opened : 13 Testing : 2 Fixed(closed) : 3 --- 1 fixed - Installer (4) Opened : 2 Testing : 1 Fixed(closed) : 1 - *Location* (5) Opened : 1 Testing : 2 Fixed(closed) : 2 --- add 1 new - E-illume (3) Opened : 1 Testing : 1 Fixed(closed) : 1 --- 1 ticket changed to testing status / add 1 new - System software (10) Opened : 9 Testing : 0 Fixed(closed) : 1 --- 1 fixed - Setting (2) Opened : 2 Testing : 0 Fixed(closed) : 0 - Distro (4) Opened : 1 Testing : 2 Fixed(closed) : 1 --- 1 ticket changed to testing status - *Unknown* (2) Opened : 0 Testing : 1 Fixed(closed) : 1 Trac : https://docs.openmoko.org/trac/milestone/Om2008.10 -- Best Regards, Regina Regina kim software testing engineer http://openmoko.com Tel:+886.2.8751.5071 ext.2852 Email:[EMAIL PROTECTED] _______________________________________________ devel mailing list [email protected] https://lists.openmoko.org/mailman/listinfo/devel
