We can set a time limit for when the min known good build increases to the
build # of 0.5.1. Basically, we keep our current minimum and before we
release, we set a date (say we released today, we'd set the date at the 29th
of january) at which point the minimum build increases automatically to the
new one.

This would allow for the network to upgrade gracefully from the older builds
to the newer builds without requiring the users to upgrade multiple times
and would also most likely get the minimum known good build to increase all
at once so we can have a more virgin network to test with.

Also it would enable the entire network to be ARK enabled which will most
likely increase the size of the network (since I will make the windows
configuration program atleast pick up on the transient setting and double
check with the user that they *really* want it to be transient).

All in all we probably are going to want to increase the minimum build, and
this seems like a more graceful way of doing it than the other major ways.
Thoughts?

-Mathew


_______________________________________________
devl mailing list
devl at freenetproject.org
http://hawk.freenetproject.org/cgi-bin/mailman/listinfo/devl

Reply via email to