I removed the WIP and not going to do much more owrk here. I'm going to get the CI build passing and then would like to merge this soon.
I know the patch is large and there's a lot of foreign details -- I had to spend quite a bit of time learning about GRPC internals. I'd prefer to not have this sit for very long (until the end of this week, at the latest) -- if there is feedback that comes in after merge I will create follow up JIRAs to track [ Full content available at: https://github.com/apache/arrow/pull/2547 ] This message was relayed via gitbox.apache.org for [email protected]
