Ok, so the path will change to 1(pre-1.6) -> 2 (this PR) -> 3 (final version), 
right? I am just worried that we will have to change the version very 
carefully, as we would have to increase version of each serializer by 2 for the 
final version.

Also if the final version will be released separately to version in this PR, 
this should be very carefully explained to the end users.

[ Full content available at: https://github.com/apache/flink/pull/6711 ]
This message was relayed via gitbox.apache.org for [email protected]

Reply via email to