Hi folks,
I have a set of n paired text input boxes (date on; date off). Each
is attached to Kelvin Luck's date picker plugin.
In most instances, the "date off" will be 7 days after the "date on",
and the next "date on" will be 1 day after the preceding "date off".
So, to help the user (so that they don't have to select dates for all
the pairs of inputs), I want to:
1. for a given pair, populate the "date off" text input with a date
that is 7 days later than the one selected in the "date on" box
2. for the following pair, populate the "date on" input with a date
that is 1 day later than that of the "date off" box (in step #1)
3. repeat step #1 and cascade this down through the rest of the pairs.
So far I can do step #1. I can't do step #2 as I don't know how to
link the changed value of dateoff0 to the function being called in
the second line of the code below (i.e. what goes in xx)
$('#dateon0').change(function() {if
(this.value.length>0)$('#dateoff0').attr("value",addTheDate(this.value,7));});
$('#dateoff0').xx(function() {if
(this.value.length>0)$('#dateon1').attr("value",addTheDate(this.value,1));});
And, of course, I can't do step 3 because I'm hard coding the dateon
/ dateoff ids - there must be a way to do a loop but I can't work
that out either.
For completeness, my date-adding function is below.
I'd really appreciate some help in filling the blanks in my capability.
Thanks,
Bruce
function addTheDate(ej,df){
var ar=new Array();
ar=ej.split('/');
var myDate = new Date;
myDate.setDate(ar[0]);
myDate.setMonth(ar[1]);
myDate.setFullYear(ar[2]);
myDate.setDate(myDate.getDate()+df);
var d = myDate.getDate();
var m = myDate.getMonth();
var y = myDate.getFullYear();
var dmy = d + "/" + m + "/" + y;
return dmy;
}
I'm at a loss on the xxx bit - how can I take the date that is
entered into #dateon, add 7 days to it, and insert it into #dateoff? _______________________________________________
jQuery mailing list
[email protected]
http://jquery.com/discuss/