I would totally do it for the spare 5k after the new system was defined and
the old system inventory had been taken.
Integration is a pain, I hear that....

The quick team scope could pull it off if the synergy was balanced; but, the
likeliness is in the lower 10 percentile.

I predict that project takes 3 years and goes through 3 teams with maybe one
survivor from the original team that really has his or her heart in it
seeing it through. 705kx3

On Wed, Mar 25, 2009 at 10:41 AM, Patrick Neeman 
<[email protected]>wrote:

> And the content migration...
>
> That's going to hurt, and cannot be done by that team.
>
>
> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
> Posted from the new ixda.org
> http://www.ixda.org/discuss?post=40427
>
>
> ________________________________________________________________
> Welcome to the Interaction Design Association (IxDA)!
> To post to this list ....... [email protected]
> Unsubscribe ................ http://www.ixda.org/unsubscribe
> List Guidelines ............ http://www.ixda.org/guidelines
> List Help .................. http://www.ixda.org/help
>
________________________________________________________________
Welcome to the Interaction Design Association (IxDA)!
To post to this list ....... [email protected]
Unsubscribe ................ http://www.ixda.org/unsubscribe
List Guidelines ............ http://www.ixda.org/guidelines
List Help .................. http://www.ixda.org/help

Reply via email to