Howdy, all. I've created a new list, [email protected]. It is meant for discussion about the physical buildout of the space, both now and into the future.
You can subscribe here: https://synhak.org/mailman/listinfo/build I've been posting daily reports about the status of the current work at 48 S. Summit to #synhak. I'll start posting them to build@ this evening, including today's. If you're helping out with installing electrical, plumbing, building walls, workbenches, or anything else, please sign up. _______________________________________________ Discuss mailing list [email protected] https://synhak.org/mailman/listinfo/discuss
