What if the EE lab and general meeting area were connected again in an
L? Having the meeting area being the entire width we could fit the 21
people we had at this weeks meeting.   Also with a shrunken machine shop
from the first post to the floor drain, a clear shot to load/unload from
the garage door including the basement & 4x8 sheets to the machine room.
The right side of the back 40 is left out, a good classroom and something
else could spaciously fit in there.  I'm just trying to get 21 unpacked.  2
weeks, 2 days till the soft launch.

http://calculais.com/syn/2/5.1.pdf
_______________________________________________
Discuss mailing list
[email protected]
https://synhak.org/mailman/listinfo/discuss

Reply via email to