This is an automated email from the git hooks/post-receive script. It was
generated because a ref change was pushed to the repository containing
the project "The Saros Eclipse Plugin". Pusher was dpp-gerrit.
The branch, master has been updated
via 573ca03bbc4164e89b5b44193a67ebf1ddeef4f1 (commit)
from a0ce2a17412b70a43db2886c27b7651c71f6ec77 (commit)
Those revisions listed above that are new to this repository have
not appeared on any other notification email; so we list those
revisions in full, below.
- Log -----------------------------------------------------------------
commit 573ca03bbc4164e89b5b44193a67ebf1ddeef4f1
Author: Stefan Rossbach <[email protected]>
Date: Wed Feb 13 20:17:37 2013 +0100
[FIX] ensure that all negotiation processes are terminated
The InviteAndLeaveTest have shown that almost
always the project negotiation will not be
correctly notified when a session ends
and so ends up with a dead process or
the session was already stopped
and the negotiation process was still
running and so produced massive NPE
exceptions.
Change-Id: I680c6cd936704e2c9643d4b4544e2eb3d31580d9
Reviewed-on: http://saros-build.imp.fu-berlin.de/gerrit/603
Tested-by: Jenkins CI
Reviewed-by: Stefan Rossbach <[email protected]>
-----------------------------------------------------------------------
Summary of changes:
.../inf/dpp/project/SarosSessionManager.java | 251 ++++++++++++--------
1 files changed, 154 insertions(+), 97 deletions(-)
hooks/post-receive
--
The Saros Eclipse Plugin
------------------------------------------------------------------------------
Symantec Endpoint Protection 12 positioned as A LEADER in The Forrester
Wave(TM): Endpoint Security, Q1 2013 and "remains a good choice" in the
endpoint security space. For insight on selecting the right partner to
tackle endpoint security challenges, access the full report.
http://p.sf.net/sfu/symantec-dev2dev
_______________________________________________
Dpp-robot mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/dpp-robot