On Mon, Apr 2, 2012 at 2:06 AM, Marcelo Pereira <[email protected]> wrote:
> Hello,
>
> I have been trying to sync two DRBD nodes, but it gets stalled at 100%.
>
> They are only 16Tb big. It has 6Tb of data to be sync'ed. How I know that??
> Well, I have never seen these nodes sync'ed, and I have transferred 6Tb of
> data to the primary node, having the secondary node down. Now I just want to
> sync.
>
> Well, the sync process forecasts 33h to go through, and I did sync two times
> already, just to see it stalled at the very 100%.
>
> I know I'm using an old version (8.2.6), but I wonder why it's getting
> stalled. The volumes are now umounted (unused) and sync'ing. I will wait
> another 33h to check this out.

Sync stalling at 100% is a known issue in 8.2.6 (several 8.2.x
versions actually, iirc). Fixed in 8.3, so do upgrade.

Florian

-- 
Need help with High Availability?
http://www.hastexo.com/now
_______________________________________________
drbd-user mailing list
[email protected]
http://lists.linbit.com/mailman/listinfo/drbd-user

Reply via email to