Hello all,

I need to use a secondary node as my syncSource for a stacked resource due to connection issues.

Is it possible to make a node in role secondary of the underlying resource as the syncSource for a stacked resource?

Here is my best attempt at my configuration:



                     Stack_res
            |                                 |
E - EQ_res - Q                 A - AB_res       {WAN Link}   - B


E, Q, and A are connected with gigabit, B however B is over a 20 megabit WAN link.

B must be in role Primary in the AB_res.

A is up-to-date with B.

EQ_res however has no data from AB_res yet, since we do not want (and cannot) send the 1.5TB of data over the slow WAN link again we need to pull it from A (i.e. Stack_res needs to be connected to A, which is in role Secondary).

I currently have Stack_res up in role primary on B however I need to move it so it is up on A now while keeping B in the primary role.


Is there a way to use a node in role secondary of the underlying resource as the syncSource for a stacked resource?

Thanks,
Aaron Johnson
_______________________________________________
drbd-user mailing list
[email protected]
http://lists.linbit.com/mailman/listinfo/drbd-user

Reply via email to