The rq pointer points inside the drm_gpu_scheduler structure. Thus
it can't be NULL.

Found by Linux Verification Center (linuxtesting.org) with SVACE.

Fixes: c61cdbdbffc1 ("drm/scheduler: Fix hang when sched_entity released")
Signed-off-by: Vladislav Efanov <vefa...@ispras.ru>
---
 drivers/gpu/drm/scheduler/sched_main.c | 3 ---
 1 file changed, 3 deletions(-)

diff --git a/drivers/gpu/drm/scheduler/sched_main.c 
b/drivers/gpu/drm/scheduler/sched_main.c
index 8c183639603e..aea5a90ff98b 100644
--- a/drivers/gpu/drm/scheduler/sched_main.c
+++ b/drivers/gpu/drm/scheduler/sched_main.c
@@ -1141,9 +1141,6 @@ void drm_sched_fini(struct drm_gpu_scheduler *sched)
        for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; 
i--) {
                struct drm_sched_rq *rq = &sched->sched_rq[i];
 
-               if (!rq)
-                       continue;
-
                spin_lock(&rq->lock);
                list_for_each_entry(s_entity, &rq->entities, list)
                        /*
-- 
2.34.1

Reply via email to