Hi Jiaxing, A short logistics note so you can plan around me rather than wait on silence: yes to both. I will read what the vendor stack actually programs into the output stage on RK3588 (your option A vs a floor enable), and separately force an output below its zero point through the open stack, so the two explanations get separated on this SoC.
I am pairing that with the oc=56/88/120 sweep you asked for earlier, as one measurement session - numbers in the coming days. If either result is going to gate something in your v9 timing, say so and I will reorder. The correction itself, with the control run and the paper-trail rounds behind it, reads solid from here. Regards, Igor
