Hi all We'll use the advanced policies form for the bitstreams, that is only accesible via Edit and after uploading the file (in difference with basic form)
We have doubts about this paragraph in the documentation "...The Pre-DSpace 3.0 embargo functionality (see below) has been modified to adjust the policies setter and lifter. These classes now also set the dates within the policy objects themselves in addition to setting the date in the item metadata..." Does it means that if we define the old # DC metadata field to hold the user-supplied embargo terms embargo.field.terms = SCHEMA.ELEMENT.QUALIFIER # DC metadata field to hold computed "lift date" of embargo embargo.field.lift = SCHEMA.ELEMENT.QUALIFIER The application will fill these metadata with the embargo end date? Is there a way that the user define the policies using the form and the metadata about embargo get filled automatically or should we recommend to our users to insert the embargo end date. Thanks in advance RH team -- You received this message because you are subscribed to the Google Groups "DSpace Technical Support" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at https://groups.google.com/group/dspace-tech. For more options, visit https://groups.google.com/d/optout.
