Hi all

We'll use the advanced policies form for the bitstreams, that is only 
accesible via Edit and after uploading the file (in difference with basic 
form)

We have doubts about this paragraph in the documentation

"...The Pre-DSpace 3.0 embargo functionality (see below) has been modified 
to adjust the policies setter and lifter. These classes now also set the 
dates within the policy objects themselves in addition to setting the date 
in the item metadata..."

Does it means that if we define the old

# DC metadata field to hold the user-supplied embargo terms
embargo.field.terms = SCHEMA.ELEMENT.QUALIFIER
 
# DC metadata field to hold computed "lift date" of embargo
embargo.field.lift = SCHEMA.ELEMENT.QUALIFIER

The application will fill these metadata with the embargo end date? 
Is there a way that the user define the policies using the form and the 
metadata about embargo get filled automatically or should we recommend to 
our users to insert the embargo end date.

Thanks in advance
RH team

-- 
You received this message because you are subscribed to the Google Groups 
"DSpace Technical Support" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/dspace-tech.
For more options, visit https://groups.google.com/d/optout.

Reply via email to