Hello all! 

I apologize for this fairly basic question (and especially if it has been 
answered here before) but if I want an Item to become publicly available on 
August 8, do I actually need to select August 9 from the date picker in the 
Start Date section of the Edit Resource Policy page and the 'Grant access 
from' section in the Bulk Access Management tool in order for DSpace to 
'convert' that date to August 8th (one day earlier) on the Authorizations 
page and apply READ: Anonymous on the 8th? 

I'm putting together some student training materials and the way the 
embargo 'start' date is described is somewhat 
confusing: 
https://wiki.lyrasis.org/display/DSDOC7x/Embargo#Embargo-DSpaceEmbargoFunctionality

Thanks as always for any guidance or confirmation :) 

Julia

-- 
All messages to this mailing list should adhere to the Code of Conduct: 
https://www.lyrasis.org/about/Pages/Code-of-Conduct.aspx
--- 
You received this message because you are subscribed to the Google Groups 
"DSpace Technical Support" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion visit 
https://groups.google.com/d/msgid/dspace-tech/dc387a3d-0167-4a4c-8655-b20aa3cafcc1n%40googlegroups.com.

Reply via email to