I can see the point if the projects are using different VC systmems (e.g. PVCS, SCCS, 
CVS), but a default location overridable on a project basis would probably be the best?
_______________________________________________
Eap-features mailing list
[EMAIL PROTECTED]
http://lists.jetbrains.com/mailman/listinfo/eap-features


Reply via email to