I've just started using the 1997 Trimble Pathfinder Office software, and I'm
looking for ways to minimize error.  I've been collecting points with the
Trimble Asset Surveyor v4.01.

I've taken two sets of points for the same location, and the some of the
corrected points for the same location are still up to 13 meters away from
each other.

Are there any ways to determine which set of corrected points has the least
error or to minimize error for both sets?

Daniel Murphy-Cairns

Reply via email to