First thanks to all you replied on my last problem, found out that R6 is installed very near the end.
Now my other question, on page 12, it says to place the "lock washers between the standoff and the pC board, NOT between the PC baord and screws as on the control board." , BUT on page 6 the diagram has the lock washer between the pc board AND standoff for the control board. Is this a mistake in the manual , I placed the lockwasher on the L-C board between the board and screw. jerry , N2UZ [EMAIL PROTECTED] 2004-11-24 _______________________________________________ Elecraft mailing list Post to: [email protected] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com

