First thanks to all you replied on my last problem, found out that R6 is 
installed very near the end.

Now my other question, on page 12, it says to place the "lock washers between 
the standoff and the pC board, NOT between the PC baord and screws as on the 
control board."            ,  BUT on page 6 the diagram has the lock washer 
between the pc board AND standoff for the control board.

Is this a mistake in the manual , I placed the lockwasher on the L-C board 
between the board and screw.


jerry   , N2UZ
[EMAIL PROTECTED]
2004-11-24


_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.): 
http://mailman.qth.net/mailman/listinfo/elecraft    
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to