For what it is worth, the 3 solder points at C6 are not vias per se, they are 
the location of a connector header for the 60 meter expansion module...If the 
expansion module is not installed, the connector header is not installed and C6 
is installed in it's place...The center hole of these 3 holes is a ground and 
is not used when C6 is installed...The C6 error seems to be common, I have seen 
at at least half a dozen times...The result is no 40 meter reception in Part II 
alignment and testing...

Jerry, wa2dkg 

>I know some-one else that also nearly did this and I was struggling to
explain what vias were because they looked like pads (and about the same
size). Luckily they stopped at that point as they were confused.<
_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to