My current setup is a K2 with a remote KPA100/KAT100 in an EC2 enclosure.

The K2 is powered by a KBT2 that is connected to a smart charger.  The
KPA100/KAT100 is powered by an external power supply.

I've noticed that the current drain as indicated by the K2's internal meter
increases 80 mA just by plugging in the KPA100/KAT100 control cable into the
K2's KIO2.  I see the increase in current regardless if the KPA100/KAT100 is
off or on (I can also hear a relay latch by plugging in the cable).  I'm
assuming this extra current is somehow related to the KPA100 and/or KAT100's
control section?

This has thrown a minor curve ball into my setup.  My goal was to operate
QRP by simply turning off the external power supply to the KPA100/KAT100,
but the K2 still provides some 80 mA of current to the external unit even
when it's off, which I'm sure will have a measurable impact on the battery
run time.

Any suggestions besides just unplugging the control cable between the K2 and
KPA100/KAT100 every time I want to go QRP?

73

Brian N5BCN

-----
K2 #6800 KPA100/KAT100-2, KSB2, KAT2, KIO2, K160RX, KNB2, KAF2, LP-PAN/K2 w/ 
Pre-amp, SignaLink USB
--
View this message in context: 
http://elecraft.365791.n2.nabble.com/K2-KPA100-KAT100-Control-Section-Current-tp6827777p6827777.html
Sent from the Elecraft mailing list archive at Nabble.com.
______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html

Reply via email to