I am going to order a K2 with a number of the options. I have also downloaded and read the assembly manual for the K2 as well as the KSB2 board for example. The assembly and installation instructions for the KSB2 instruct you to disassemble part of the rig for the installation of the board. Is there any coordination instruction given for building the rig when you are installing the options at the time of rig assembly? Frank WY3D _______________________________________________ Elecraft mailing list Post to: [email protected] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com

