Last week, thanks to some very diligent field testing, we discovered a  
way to significantly reduce LC network losses on the highest bands  
(especially on 6 meters).

We just redesigned the PC board to take advantage of this, so you'll  
be getting a better ATU. This will push the production schedule out  
farther, and we had to scrap a lot of material, but the change will be  
worth the trouble.

We'll post a revised shipping date as soon as Eric recovers from his  
latest hamfest adventure.

73,
Wayne
N6KR


On Aug 30, 2012, at 8:06 AM, r miles wrote:

>
> Saturday is Sept !. I know the tentative shipping date is early Sept.
> Any news ??????
>
> K9IL
> ______________________________________________________________
> Elecraft mailing list
> Home: http://mailman.qth.net/mailman/listinfo/elecraft
> Help: http://mailman.qth.net/mmfaq.htm
> Post: mailto:[email protected]
>
> This list hosted by: http://www.qsl.net
> Please help support this email list: http://www.qsl.net/donate.html

______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html

Reply via email to