Some differences found during my recent building. Manual is RevC, Feb 2004 with Errata Rev C-5 July 20 2005
P14 Clearance under Heatsink RHS column first item. On my heatsink there was a land in the area of C65, C75 and C74 which reduced the board to heatsink clearance to 4.0mm. The stated clearance needed is "4.5mm" P31 fig 23 and fig 22 The shown position of the earth wire from J2 obstructs the earthing clip now part of the additional shield earthing. P48 RHS column item 6. The holes in the spring clips were too small for the supplied screws and I needed to enlarge the holes slightly. P49 fig 39 The RHS of the end elevation below does not align with the plan view above. P64,65 The circuit diagram is extremely hard to read because the interconnection "dots" are way too small. A lot less than other Elecraft circuits. Hope this assists 73, Nigel ZL2DF _______________________________________________ Elecraft mailing list Post to: [email protected] You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com

