I just put one together over July 4th weekend. A lot of fun. Besides the very 
good advice from others I would add the following. I would have some small 
plastic divider boxes on hand for hardware sorting. The main RF board has most 
of the hardware components, but you will have a number of sub assemblies 
(boards) depending on what your radio configuration is i.e. Options etc. each 
assembly comes with its own set of hardware. I found it best to sort these 
items into a separate small divided box. You will be pulling hardware from the 
main RF board supply interspersed with these subassemblies. Also a good pair of 
tweezers is handy to pick the small hardware items out of the divider boxes. 
Elecraft gives you extra hardware so don't sweat if you loose something. You 
will eventually find it after construction is complete. That's one of Murphy's 
corollaries.

73, Dave, K1KA

David Mackey
[email protected]
______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to [email protected]

Reply via email to