Errata Step 2 states;
2. Page 47, right column, 2nd assembly step: This step was supposed to be on page 64, right column, just before "Assembly, Part III". Make a note on page 64 referring to the step on page 47.


Is this the section it is referring too? They are wanting you to do this before Assembly III? I can't make any sense out of linking page 64, which is starting an assembly process, to page 47?

***If you have an Elecraft XG1 receiver test oscillator or other
calibrated signal source, set it for 50 microvolts (-73 dBm) and
verify that the S-meter indicates S-9. If not, adjust C A L S H I .****
--

David Wilburn
[EMAIL PROTECTED]
K4DGW

_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to