G'day,

----- Original Message ----- 
From: "wayne burdick" <[EMAIL PROTECTED]>
To: "Nick Henwood" <[EMAIL PROTECTED]>
Cc: <elecraft@mailman.qth.net>
Sent: Sunday, May 04, 2008 6:13 PM
Subject: [Elecraft] Re: K3 Second Receiver


| No. Our sheet metal fabricator was sick for a week, and he didn't get a
| tool drawing to the tool maker in time (for adding a punched recess to
| the KRX3 bottom shield). By the time he discovered this -- and the
| toolmaker got back from *his* vacation -- the tool was two weeks past
| due. I just heard on Friday that the tool is due on Tuesday, which
| means the first batch of subreceivers will go out late next week. (Eric
| was too busy with the recent firmware release to update the status
| page, but I assume he'll be doing this on Monday.)

I look forward to reading the installation manual.

Regards,

Mike VP8NO 

_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to